What are tips for managing a project and team dynamics? What is the relationship between stakeholders and the extended project management team?

Information Technology – Chapter 4 Project Team Members

Initial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.

Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text.

Also, provide a graduate-level response to each of the following questions:

1.Who is typically part of a project team? What are tips for managing a project and team dynamics?

[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words]

[Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review]

2)2page in length

2.What is the relationship between stakeholders and the extended project management team?

 

What are tips for managing a project and team dynamics? What is the relationship between stakeholders and the extended project management team?
Scroll to top