Conduct a complete risk assessment (RA) for a task of your choosing. Discuss the reasoning you used to assign the likelihood and severity of each hazard before and after controls were implemented.

Risk Assessment Project
In this assignment, you will conduct a complete risk assessment (RA) for a task of your choosing.

1. Select a work task you are familiar with for which the risks can be assessed. The task must be representative of an industrial work process, not a task you would do at home or around the house. The task must have at least five steps and five distinct hazards to address. Just be certain you are evaluating at least five hazards in all.

2.. Click here to access the form to document your risk assessment, staring with a description of the process or task. In the description, include the reasons why you selected the task.

List the task steps in order, and identify the hazards at each step. Using the Risk Matrix on page 283 of the textbook (there is a color version in the Unit VII Study Guide), estimate the likelihood, severity, and risk rating for each hazard.

3. Propose one or more risk-reduction tactics for each identified hazard. Reevaluate the likelihood, severity, and risk rating for each hazard after control measures are implemented.

4. In the Discussion section of the form, discuss the reasoning you used to assign the likelihood and severity of each hazard before and after controls were implemented.
Provide your conclusion by summarizing which risks were reduced to acceptable levels and which ones require additional controls.
Comment on the next steps that the organization needs to take regarding this task.
The discussion must be at least 300 words in length.

5. When saving the file, use this file naming convention: LastName_BOS4520_Final_RA.doc