Create a weighted scoring table by multiplying each of the entertainment scores by the weight and determining an analysis score.

Information system project management

Indicate the relative importance of the criteria by assigning a weight to each. Note that the weights should sum to 1.0 or 100 percent.

Criteria Weight Liverpool FC Spotify Three Days Grace NY Yankees
Ease of use 0.3 2 5 2 4
Availability 0.2 3 2 2 3
Interaction 0.5 2 3 1 2
Analysis score Should add to 1.0 2.2 3.4 1.5 2.8

Following the example shown, create a weighted scoring table by multiplying each of the entertainment scores by the weight and determining an analysis score.

Choose an entertainer for whom you would like to design a site. You can redesign a bad entertainment site you reviewed, or you can develop an entirely new site.

Create a weighted scoring table by multiplying each of the entertainment scores by the weight and determining an analysis score.
Scroll to top